Abstract
Accurate cost estimates are essential for proper planning, budgeting, and execution of infrastructure construction projects. However, the issue of the cost growth is prevalent in the construction industry. Past studies have focused on developing parametric cost estimating models, allocation of fixed contingencies, and use of risk registers to improve the accuracy of the cost estimates. However, these methodologies have various issues. For example, parametric models generally do not offer sufficient level of accuracy once some design details are available. Fixed contingencies fail to address the variability of cost changes based on project characteristics. Finally, the risk registers require extensive amount of subjective input. Further, such subjective inputs require additional time and effort from the estimators, and subjective inputs can be less reliable than the objective inputs based on the historical data. A new framework is needed to improve the accuracy of estimates, which also addresses these issues related to existing methodologies. This study introduces a novel framework to adjust preliminary cost estimates to make it more reflective of the likely final estimates using historical trend of changes in cost estimates. The framework consists of project level simple and project level detail analyses. The first analysis provides a macroanalysis by ignoring the project characteristics and focusing more on the overall trend for all projects. The second set of analyses adjusts the preliminary cost estimates based on project characteristics such as work type and project location. The results are aggregated in two phases to produce the adjusted preliminary estimates. The validation of the framework shows that for six out of nine projects, the accuracy of the preliminary estimates was improved by an average of 29%.
| Original language | American English |
|---|---|
| Title of host publication | Joint CSCE Construction Specialty & CRC Conference 2025 |
| Pages | 1-7 |
| Number of pages | 7 |
| DOIs | |
| State | Published - Jul 2025 |
Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS